The concrete floor – in 3 parts

Part 1 – July 14/15, 2018
Before the insulation will be put in place by the mason company, we had one weekend to dig and close trenches for the future water pipes and electric pipes.

So Bob the Builder took the shovel in the hand again and was diggin.

Part 2 – 21./22. July 2018
The weekend after, the insulation and the steel for the concrete was already in place. The two men in the family had to thread the missing pipes for the electrical system between the insulation and the steel. It was not that easy but they did the job.

Part 3 – July 28/29, 2018
It’s done finally; Last week the new concrete floor has finally been poured. In between the mason company irrigated several times the concrete floor to avoid that it dries too fast.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s